Wind Power Project EHV(Extra High Voltage) Power Transmission Construction

Apr 13, 2017

fengdian.jpg

Customer Name:

Datang Xinjiang Energy Development Co., Ltd.

Project Name:

Datang Dabancheng Fetch Chaiwobao Wind Power Plant First Phase Wind Power Transmission Project

Goal:

The project will effectively utilize the wind energy resources of Dabancheng, which will be absorbed by Xinjiang main power grid through 220 kV transmission line.

Product Contents: EHV 220 kV ACSR; AAAC

Construction Duration: One year


Related Industry Knowledge
Products
Overhead Conductor
Aerial Insulated Cable
0.6/1KV Power Cable
Up to 35 KV Power Cable
Equipment Cable
Concentric Cable
Special Cable
About Us
Company Profile
History
Management Philosophy
Company Certificate
Social Responsibility
Technology
Overhead Conductors
ower Cable
Wires and Cables for Electrical Equipment
Contact Us

Shijiawan industrial estate,Yanshi city,Henan,China

Tel: +86-371-5515-7231

sales1@htcable.cn

Copyright © Huatong Cable Inc All Rights Reserved.