Kenya Power Grid Corporation Transmission and Transformation Line Construction Project

Apr 13, 2017

kenniya.jpg

Customer Name:

Kenya Power Grid Corporation

Project Name:

Kenya Energy Reconstruction (UN) International Development Association (Loan Registration No.: 4557-KE)

Goal:

The energy reconstruction project will substantially improve the performance of transmission and transformation of power in Kenya, optimize the power grid structure and upgrade its safety, which will play a key role in the energy adjustment strategy of Kenya. It is a major support project of UN International Development Association to Kenya.

Product Contents:

220 kV ACSR (400 km)

Construction Duration: 6 months


Related Industry Knowledge
Products
Overhead Conductor
Aerial Insulated Cable
0.6/1KV Power Cable
Up to 35 KV Power Cable
Equipment Cable
Concentric Cable
Special Cable
About Us
Company Profile
History
Management Philosophy
Company Certificate
Social Responsibility
Technology
Overhead Conductors
ower Cable
Wires and Cables for Electrical Equipment
Contact Us

Shijiawan industrial estate,Yanshi city,Henan,China

Tel: +86-371-5515-7231

sales1@htcable.cn

Copyright © Huatong Cable Inc All Rights Reserved.