logo

Project

Contact Us

Share

Hydropower Construction Project Electric Power Transmission Line

Apr 13, 2017

shuidian.jpg

Customer Name:

China Three Gorges Project Corporation

Project Name:

The Three Gorges Dam Project Third Phase Power Transmission Line Construction

Goal:

The project will install 32 water-turbine generator sets, each with 700,000 kW capacity on both sides of the Three Gorges Dam, as well as 2 power stations of 50,000 kW capacity. The total installed gross capacity of 22.5 million kW is top of the world and has greatly alleviated the regional power shortage of the State Grid.

Product Contents:

35 kV- power cable; 220 kV ACSR; power cable accessories

Construction Duration: 10 months


Related Industry Knowledge
Products
Overhead Conductor
Aerial Insulated Cable
0.6/1KV Power Cable
Up to 35 KV Power Cable
Equipment Cable
Concentric Cable
Special Cable
About Us
Company Profile
History
Management Philosophy
Company Certificate
Social Responsibility
Technology
Overhead Conductors
ower Cable
Wires and Cables for Electrical Equipment
Contact Us

Shijiawan industrial estate,Yanshi city,Henan,China

Tel: +86-371-5515-7231

sales1@htcable.cn

Copyright © Huatong Cable Inc All Rights Reserved.