Extra-high Voltage Power Transmission Project in Thermal Power Engineering Construction

Apr 13, 2017

huodian.jpg

Customer Name:

China Resources Power Holding Company

Project Name:

Electric Power Transmission Line for Phase-III Project of Pengcheng Power Plant in Xuzhou.

Goal:

This project planned to construct two 1000MW supercritical coal-fired power generating units which will transmit electric power to Jiangsu Power Grid by 500KV lines.

Product Content:

Extra-high voltage 500KV aluminum cable steel reinforced (ACSR), electric power fittings, iron tower, insulator.

Construction Duration: One year



Related Industry Knowledge
Products
Overhead Conductor
Aerial Insulated Cable
0.6/1KV Power Cable
Up to 35 KV Power Cable
Equipment Cable
Concentric Cable
Special Cable
About Us
Company Profile
History
Management Philosophy
Company Certificate
Social Responsibility
Technology
Overhead Conductors
ower Cable
Wires and Cables for Electrical Equipment
Contact Us

Shijiawan industrial estate,Yanshi city,Henan,China

Tel: +86-371-5515-7231

sales1@htcable.cn

Copyright © Huatong Cable Inc All Rights Reserved.